Plug-in Solar East of England

A form, not an application

The order matters here. You buy it, you plug it in, and then you tell them. Nobody is being asked for permission at this stage.

Who holds the licence here

Our working map puts this region in the Eastern England distribution licence area, held by Eastern Power Networks plc, one of three areas operated by UK Power Networks alongside London and the South East.

We call that a working map rather than an answer because our source for the fourteen licence areas is a secondary one, and boundaries do not follow county lines. The operator publishes a postcode checker, it is authoritative, and it takes a moment.

Why this is worth a minute of your time

Getting it wrong does not break anything, but it wastes a fortnight. The notification goes to whoever actually distributes electricity to your address, which is not your energy supplier and has nothing to do with who sends your bill.

The whole job

One device, and the limit is not the product rule

The specification would permit one per final ring circuit. The connection rules are tighter and allow one per household, and the tighter of the two is the one you live under. Two devices is not a plan.

Where this came from

FactSource
Plug-in solar admitted to G98Raised by the Energy Networks Association on 1 April 2026, approved by the Authority in an Ofgem decision dated 11 August 2026
In force from 27 August 2026Tied to the product and supply regulations coming into force, SI 2026/848
One device per householdThe same G98 change
28 days, three fields, five to ten minutesThe department's final stage impact assessment, which describes the intended process rather than imposing a penalty
Great Britain onlyNorthern Ireland sits under G98/NI and its position is unresolved